RICOM's manufacturing facility supports the production of both standard equipment and non-standard industrial cooling systems.
The workshop is organized around different manufacturing stages, including material preparation, sheet-metal processing, pipe fabrication, welding, mechanical assembly, electrical installation, system integration, equipment testing, final inspection, and export packaging.
By coordinating these production stages within one manufacturing system, we can respond more efficiently to different product models, project conditions, and customization requirements.

01
Complete Production Process
From material preparation to final inspection, each stage is coordinated according to confirmed technical requirements.
02
Professional Production Team
Our technical and production teams work together during fabrication, assembly, electrical installation, and testing.
03
Standard and Custom Manufacturing
The facility supports regular chillers and customized equipment for different temperatures, voltages, applications, and operating environments.
04
Quality Inspection and Testing
Inspection and functional testing are carried out during assembly and before delivery to verify equipment configuration and operating condition.
Manufacturing Equipment
RICOM uses a range of processing equipment to support industrial chiller production.

Tube Bending Equipment
Used for refrigeration and water-system pipe processing.

CNC Machining Equipment
Used for condenser tube sheets and precision metal parts.

Punching and Shearing Equipment
Used for sheet-metal cutting, forming, and structural preparation.

Drilling Equipment
Used for positioning, drilling, and component processing.








From Materials to Finished Equipment
Production Process
Step 1: Material Preparation
Materials and purchased components are prepared according to the confirmed product configuration.
Step 2: Metal and Pipe Processing
Panels, housings, frames, and pipes are cut, bent, drilled, expanded, and prepared for assembly.
Step 3: Welding and Assembly
Frames, tanks, refrigeration components, pumps, valves, and piping are installed.
Step 4: Electrical Installation
Control panels, sensors, wiring, alarms, and protection devices are installed and checked.
Step 5: System Testing
The refrigeration, water-circulation, and control systems are tested before delivery.
Step 6: Final Inspection and Packaging
The product configuration, appearance, accessories, documents, and packaging are checked before shipment.






Quality Control and Testing
Quality inspection is carried out throughout production.
Our checks include:
- Incoming material inspection
- Component and dimensional inspection
- Welding inspection
- Pipe connection inspection
- Electrical inspection
- Refrigeration-system inspection
- Water-circulation test
- Temperature-control test
- Alarm-function test
- Final appearance and configuration inspection
Packaging and Delivery
Finished equipment is packed according to the machine size, shipping method, and order requirements.
Packaging and delivery preparation may include:
- Protective film
- Equipment fixing
- Wooden-case packaging
- Moisture protection
- Accessory packing
- Shipping marks
- Forklift handling
- Container loading
- Technical document preparation