Our Certificate

 

 

page-465-320
page-3173-4231

CE Certificates

page-3173-4231

CE Certificates

第3175-4234页

Invention Patent

Utility Model Patents

 

 

page-3175-4490

Dual-Source Air-Cooled Chiller

page-3175-4490

Air-Cooled Chiller Heat Dissipation Device

page-3175-4490

Chiller Expansion Valve

page-3175-4490

Water-Cooled Industrial Chiller

page-3175-4490

Pipe Positioning and Expansion Device

page-3175-4490

Intelligent Industrial Chiller

page-3175-4490

Cooling-Water Pre-Filter

page-3175-4490

Shield Machine Cooling Device

 

Quality Control Process

 

 
1

Incoming Material Inspection

Materials and purchased components are checked according to product specifications and production requirements before entering the manufacturing process.

2

Component Processing Inspection

Processed metal parts, pipe components, structural parts, panels, and accessories are inspected during fabrication.

3

Welding and Structural Inspection

Welded frames, tanks, supports, and structural components are checked for assembly quality and visible defects.

4

Refrigeration System Inspection

Compressors, condensers, evaporators, expansion components, refrigerant piping, and system connections are reviewed before trial operation.

5

Water System Inspection

Pumps, tanks, water pipelines, valves, and circulation paths are checked for correct installation and connection.

6

Electrical Inspection

Control panels, wiring, electrical components, sensors, alarms, and protection devices are inspected before equipment testing.

7

Trial Operation

The equipment is operated to verify water circulation, control functions, temperature response, alarm functions, and general operating performance.

8

Final Inspection

Product appearance, configuration, accessories, documents, and packaging requirements are checked before delivery.

 

 