Our Certificate

CE Certificates
CE Certificates
Invention Patent
Utility Model Patents

Dual-Source Air-Cooled Chiller

Air-Cooled Chiller Heat Dissipation Device

Chiller Expansion Valve

Water-Cooled Industrial Chiller

Pipe Positioning and Expansion Device

Intelligent Industrial Chiller

Cooling-Water Pre-Filter

Shield Machine Cooling Device
Quality Control Process
Incoming Material Inspection
Materials and purchased components are checked according to product specifications and production requirements before entering the manufacturing process.
Component Processing Inspection
Processed metal parts, pipe components, structural parts, panels, and accessories are inspected during fabrication.
Welding and Structural Inspection
Welded frames, tanks, supports, and structural components are checked for assembly quality and visible defects.
Refrigeration System Inspection
Compressors, condensers, evaporators, expansion components, refrigerant piping, and system connections are reviewed before trial operation.
Water System Inspection
Pumps, tanks, water pipelines, valves, and circulation paths are checked for correct installation and connection.
Electrical Inspection
Control panels, wiring, electrical components, sensors, alarms, and protection devices are inspected before equipment testing.
Trial Operation
The equipment is operated to verify water circulation, control functions, temperature response, alarm functions, and general operating performance.
Final Inspection
Product appearance, configuration, accessories, documents, and packaging requirements are checked before delivery.

