Industrial Chiller Project in Cambodia Cement Plant

Our company has cooperated with well -known cement production enterprises in China for many years, and has participated in the construction of cooling system equipment for the two major factories and production workshops in Hubei, including water -cooled and air -cooled machines.

In cooperation, we fully understand the needs and solve the problem.

In 2018, it participated in the production and construction of the cooling system of the Cambodian factory in the Cambodian factory of the overseas branch.

In the production of cement packaging, the industrial Chiller supports DrawingMachine, Laminating Machine, and uninterrupted in 24 hours. We provide two sets of cold water units.

 

page-666-444

 

Unit 1 (supporting Drawingmachine)::

60 hp water -cooled units (four vortex compressors),80 tons of open square water tower

3 water pumps: 7.5kW frozen water circulation pump, 5.5kW freezing pump, 5.5kW cooling water tower pump, 80 -ton tower

2 water tanks: 3 m³frozen water tanks, 3 m³cooling water tanks
 

 

Unit 2 (supporting Laminating Machine)::

100HP water -cooled Chiller, (eight vortex compressors),80 tons of open square water tower

3 water pumps: 15KW freezing water circulating pump, 7.5kW freezing water

Inner circulation pump, 7.5kW cooling water towe pump, 100 tons of water tower

2 water tanks: 3 m³frozen water tanks, 3m³ cooling water tanks

page-653-436

Two standards 5HP, One 30HP Air cooled Chiller are used for packaging printing and production. Water tank water pump inside

page-507-338
page-504-336

Construction site photo

page-1200-1200

page-1200-1200

 